How to Duplicate a Coda Doc

Learn how to duplicate a Coda doc in a few clicks, keeping your original intact while you edit, test, or reuse content.

Quick answer

Open the doc you want to copy, click the ellipsis icon next to its name in the doc list or inside the doc itself, then select Copy doc from the menu. Rename the duplicate if you'd like, confirm by clicking Copy, and Coda creates a fully separate version instantly.

Steps at a glance

  1. Open your Coda workspace and locate the doc
  2. Click the ellipsis (···) icon next to the doc
  3. Select Copy doc from the dropdown menu
  4. Rename the copy in the dialog box
  5. Click Copy to confirm and create the duplicate
  6. Open the new doc to start editing

Summary

Duplicating a doc in Coda creates an independent copy of every page, table, and formula without touching the original file. It's the fastest way to reuse a well-built structure for a new project, client, or team member.

Step-by-step guide

  1. Step 1

    Find the doc you want to duplicate

    Go to your Coda home screen or workspace folder and locate the doc. If you have many docs, use the search bar at the top to find it faster by name.

  2. Step 2

    Open the options menu

    Hover over the doc's thumbnail in the doc list and click the ellipsis icon (···) that appears in the corner. If you already have the doc open, click the same ellipsis icon near the doc title at the top of the page.

  3. Step 3

    Select Copy doc

    From the dropdown menu, choose Copy doc. This opens a small dialog box where you can name the new copy before it's created.

  4. Step 4

    Rename the duplicate

    Type a new name for the copy so it's easy to distinguish from the original, especially if you're planning to reuse this structure for recurring projects like a sprint plan or content calendar. Clear naming also helps collaborators avoid opening the wrong version.

  5. Step 5

    Confirm the copy

    Click the Copy button in the dialog box to finish the process. Coda generates a brand-new doc with all pages, tables, and formulas intact, while your original remains untouched.

  6. Step 6

    Review and adjust the new doc

    Open the duplicate and check that tables, automations, and pack connections carried over correctly. This is a good time to update permissions using /guides/coda/set-permissions or add new collaborators via /guides/coda/invite-collaborators before sharing it further.

  7. Step 7

    Share or reuse the duplicate

    Once you're happy with the copy, share it with your team or convert it into a reusable layout. If you plan to duplicate this structure often, consider saving it as a starting point using /guides/coda/create-templates instead.

Why this matters

You've spent hours building a project tracker or client onboarding doc and now need the same structure for a new team or quarter. Duplicating lets you reuse that work instantly instead of rebuilding tables, formulas, and pages from scratch.

Frequently asked questions

  • Does duplicating a doc copy its permissions and collaborators?

    No. The duplicate starts with only you as the owner. You'll need to manually re-add collaborators and reset sharing permissions on the new copy.

  • Can I duplicate just one page instead of the whole doc?

    The Copy doc option duplicates the entire document. To reuse a single page's layout, copy its content manually or build it into a reusable template instead.

  • Will duplicating a doc affect the original in any way?

    No. The original doc stays completely unchanged. The duplicate is a fully independent copy, so edits made in either version don't affect the other.

  • Can I turn a duplicated doc into a reusable template?

    Yes. After duplicating and customizing a doc, you can save it as a template so your team can generate new copies with consistent structure going forward.

Create interactive demos like this one — free, no coding required.

Start for free →